2. Base Stage

The Base Stage of this ground floor extension involved some final clearing and levelling of area, the installation of underground plumbing and finally the laying of the concrete slab. Calculating the correct floor level was critical in obtaining an even and seamless floor from existing to the new extension.

Laying the foundation of the new ground floor extension