Take a virtual tour through your design!
SEE HOW IT WORKS
0800 010 010
Free consultation
Your guide to building permits in the city of MelbourneYour guide to building permits in the city of Melbourne
Your guide to building permits in the city of MelbourneYour guide to building permits in the city of Melbourne

Your guide to building permits in the city of Melbourne

Your guide to building permits in the city of Melbourne

By
January 10, 2025
By
January 10, 2025
minute read

Everything you need to know about the building permit process

If you’re planning a home renovation in Melbourne, there’s no getting around building permits — they’re a crucial part of making sure your project complies with local regulations. But we know that for most homeowners, the process can feel like a maze of paperwork and red tape.

At Supa Group, we’ve been guiding homeowners through the permit process for decades. From dealing with councils to submitting applications, we’ve done it all. The best part? With the right advice and a clear plan, getting your permits doesn’t have to be a headache.

In this guide, we’re breaking down what you need to know about town planning approvals and building permits, including:

  • When you need them and how to tell the difference.
  • A step-by-step look at applying for building permits.
  • What you can expect to pay and how to budget for approvals.
  • Why permits are essential and the risks of skipping them.
  • How Supa Group handles the process to make your life easier.

By the time you’re done reading, you’ll have the confidence to navigate approvals like a pro and take the first step toward bringing your home improvement plans to life.

What are town planning approvals and building permits?

Before you can start building your dream home extension, it’s important to understand the difference between town planning approval and a building permit. While they’re both essential parts of the process, they serve very different purposes.

Simply put, town planning approval is about making sure your project aligns with local council rules, while a building permit ensures your building work complies with safety and construction standards. This distinction is vital to keeping your project on track and avoiding issues down the line. For more details, the Victorian Building Authority has a detailed guide on permits for home renovations.

What is town planning approval?

Town planning approval is all about making sure your project fits within the broader rules for your neighbourhood. Councils use this process to protect the character and zoning of local areas, ensuring that developments don’t clash with the surrounding environment.

You’ll typically need town planning approval if your project involves:

  1. Extending your home on a small or sensitive block.
  2. Building close to property boundaries or in heritage overlay areas.
  3. Making significant changes to the appearance of your property, like adding a second storey or a new façade.
  4. Developing a unit or townhouse on residential land.

The exact rules vary between councils, but the goal is always the same — to ensure projects align with the vision for the local area.

What is a building permit?

A building permit is your green light to start construction. It ensures that your plans meet all relevant building codes and safety standards as outlined in the Building Act 1993. This legislation governs how construction projects must be managed in Victoria to ensure they’re safe, durable, and compliant.

For most projects, you’ll need a building permit in Melbourne if you’re:

  • Adding a house extension or new structure, like a deck or carport.
  • Making structural changes, such as removing or adding walls.
  • Installing features like swimming pools, spas, or large sheds.

To apply, you’ll need detailed documentation, including:

  • Architectural plans and drawings.
  • Engineering reports for structural elements.
  • Energy efficiency ratings, like a NatHERS certificate.

A registered building surveyor will review your application to ensure it complies with Victorian building codes and regulations.

Understanding the difference between town planning approval and a building permit is crucial to keeping your project on track. While the paperwork might seem overwhelming, these approvals ensure your home is safe, compliant, and built to last.

When do you need a building permit in Victoria?

If you’re planning a home extension or renovation in Victoria, figuring out whether you need a building permit is one of the first steps. For most projects that involve structural changes or major additions, a permit isn’t optional — it’s what keeps your project safe, legal, and up to code. That said, not every project requires one, and some smaller works fall under permitted development extensions.

Knowing the rules can save you a lot of stress (and money) down the line. Here’s a simple breakdown of when you’ll need a permit and when you might not.

Examples of work requiring a permit

Most projects that involve significant structural changes or additions to your home will need a building permit. Common examples include:

  1. House extensions. Whether you’re adding an extra room, extending your kitchen, or building a second storey, you’ll need a house extension permit.
  2. Structural renovations. Removing or adding load-bearing walls or major alterations to your home’s layout will require approval.
  3. Pools and spas. Installing a swimming pool or spa, along with the necessary fencing, must comply with strict safety standards and requires a permit.
  4. Decks and verandahs. Larger decks, verandahs, or outdoor entertaining areas often need approval, especially if they are elevated.
  5. Carports and garages. Adding a new carport, garage, or any covered outdoor area generally requires a permit.
  6. Retaining walls. Walls over a certain height (usually 1 metre) or those near property boundaries will need approval.

Projects that might not need a permit

Some minor works and renovations are considered exempt from needing a building permit. These are often small, non-structural projects that don’t affect safety or compliance. Examples include:

  1. Small garden sheds. Freestanding sheds under a certain size (typically less than 10 square metres) may not require a permit, but placement and height restrictions apply.
  2. Low-level decks. Ground-level decks under a specified height (usually 800mm) may be exempt in some areas.
  3. Minor renovations. Cosmetic updates like painting, retiling, or replacing cabinets usually don’t need approval.
  4. Fences. Depending on the height and location, certain fences may not require a permit. Always check with your local council.
  5. Temporary structures. Portable items like gazebos or shade sails may not need permits if they’re below certain size thresholds.

Before starting any project, it’s always a good idea to check with your local council or a registered building surveyor to confirm whether a permit is required. If you’re unsure, Supa Group can guide you through the process to make sure your project is compliant from the start.

Steps to apply for a building permit in Melbourne

Applying for a building permit in Melbourne might seem daunting, but with the right preparation, it’s a straightforward process. A permit ensures your project meets safety and compliance standards, and taking the time to get it right at the start will save you from costly headaches later. Here’s a step-by-step guide to help you navigate the process.

Step 1: Prepare your documentation

Before you even think about submitting your application, it’s time to get your paperwork in order. A complete application is key to avoiding delays, so make sure you have everything you need:

  1. Architectural plans. These must be detailed and include dimensions, materials, and layouts for all parts of the project.
  2. Engineering drawings. If your project involves structural changes, like beams or load-bearing walls, you’ll need certified engineering designs.
  3. Energy efficiency ratings. In Victoria, you’ll need to meet certain energy standards, such as a NatHERS certificate, to ensure your project is environmentally responsible.
  4. Title and property information. Your property title and any overlays or covenants need to be included to confirm land use permissions.

Step 2: Check council requirements

Building regulations vary depending on where you live, so it’s important to understand your local council’s rules before submitting your application. For example, the City of Melbourne may have different requirements than a smaller suburban council. Additionally, some projects may require a planning permit to address zoning, heritage overlays, or other site-specific conditions before you can apply for a building permit.

  1. Review zoning regulations. Check if your project complies with local zoning laws or if additional approvals are needed.
  2. Confirm overlays. Heritage overlays or bushfire-prone areas can add extra requirements to your permit application.
  3. Speak with council officers. Many councils offer pre-application consultations, which can clarify requirements and save you time.

Step 3: Submit your application

Once your documents are ready and you’ve checked your local council’s requirements, it’s time to submit your building permit application in Melbourne. Unlike town planning approval, only a private building surveyor or council-appointed relevant building surveyor can issue a building permit for a proposed building project. Private building surveyors often speed up the process, ensuring your application is reviewed quickly and efficiently.

  1. Find a registered building surveyor. Use the Victorian Building Authority’s (VBA) website to locate a qualified professional.
  2. Lodge your documents. Provide all required paperwork, including plans, engineering reports, and energy ratings.
  3. Pay application fees. Fees vary depending on the project’s size and complexity, so confirm costs with your surveyor beforehand. A building permit levy, a state-imposed fee to support regulatory oversight and compliance monitoring for construction works, may also apply. Be sure to check this cost with your building surveyor.

Step 4: Respond to feedback and approval

Once your application is lodged, the building surveyor will review your documents to ensure everything complies with building codes and safety standards. Be prepared for some back-and-forth during this stage.

  1. Address requests for additional information. The surveyor might ask for clarifications, updated drawings, or extra documentation, like soil reports.
  2. Make amendments if needed. If something in your plans doesn’t meet compliance, you’ll need to revise and resubmit the affected documents.
  3. Receive your approval. Once everything is in order, your building permit can be issued, allowing you to start construction.

Why the Building Permits Register matters for your project

Once your permit application is approved, it’s worth checking the public register of building permits. This register records all building permits for building works, including permits for building works issued by Melbourne Certification Group, and also any building works issued by private building surveyors within the city of Melbourne. Each entry includes a building permit number, which is unique to your project and ensures it is properly documented for future reference.

It’s an invaluable resource for homeowners who want to confirm that their project has the appropriate approvals in place.

If you require a building permit, the register helps ensure transparency and compliance with Victorian building codes. It’s not just about ticking a box — verifying your permit on the register protects your investment and ensures your home extension or renovation is documented correctly. By doing so, you can avoid potential delays, legal issues, or complications if you decide to sell your property in the future.

Applying for a building permit can feel like a lot of work, but breaking it down into steps makes it manageable. And remember, if you’re working with Supa Group, we handle the building and renovation process for you, making sure your application is complete and compliant from the start.

Understanding building permit costs in Victoria

Building permits are a must for most home extensions and renovations, but they come with costs that can vary depending on your project’s size and complexity. Based on our experience, we’ve seen fees range widely across Victoria, especially between inner-city Melbourne and the suburbs. While the numbers we’re sharing are a helpful rule of thumb, it’s always best to check with your council or building surveyor for an accurate quote.

Here’s what we know about what impacts permit costs and what you might expect to pay.

Factors affecting permit costs

Not all permits cost the same, and several factors can influence the final amount. The Building Regulations 2018 outline specific standards and requirements that may impact your fees, especially for projects involving complex designs or additional reports.

  1. The complexity of your project. A straightforward single-storey extension will cost less than a multi-storey renovation that needs extra engineering and documentation.
  2. Inspection fees. During construction, mandatory inspections (like footings or final sign-off) will add to your overall costs.
  3. Specialist reports. Depending on your site, you might need soil testing, energy efficiency ratings, or reports for heritage or bushfire overlays, which come at an extra charge.
  4. Amendments and resubmissions. If your plans need adjustments or additional reviews, you could face extra fees.
  5. Council overlays. Building in areas with heritage or environmental overlays often comes with added requirements — and costs.

Average building permit fees in Melbourne

From what we’ve seen, here’s a general idea of what you might expect to pay for different types of projects:

  • Small renovations or non-structural works:
  • Fees: $500–$1,500
  • Example: Minor bathroom upgrades or installing a pergola.
  • Fees: $1,500–$3,000
  • Example: Adding a new bedroom or extending your living area.
  • Fees: $3,000–$5,000+
  • Example: Adding a second storey or significant structural changes.
  • Swimming pools and spas:
  • Fees: $1,000–$2,500 (including fencing compliance).
  • Inspection costs:
  • Additional: $200–$500 per inspection, depending on the surveyor and complexity of the project.

While these costs give you a ballpark idea, every project is different. A house extension permit in an outer suburb might cost less than one in inner-city Melbourne, where additional regulations could come into play.

To get an accurate idea of what your building permit will cost, we always recommend speaking with your council or a registered building surveyor. If you’re working with us at Supa Group, we’ll handle the process for you and give you a clear breakdown of what to expect upfront.

What happens if you build without a permit?

Building without a permit might seem like a shortcut, but it’s a risk that can lead to serious consequences. From fines and legal action to trouble selling your home later on, skipping this crucial step often creates more headaches than it’s worth.

We’ve seen what can go wrong when permits aren’t in place, which is why compliance is always a priority for every project we take on. Trying to pull off a house extension without a permit can be costly and time-consuming. Here’s what you need to know about the risks of non-compliance.

Legal and financial penalties

The first thing you’ll face if you build without a permit is potential legal and financial trouble. Victorian authorities take building compliance seriously, and penalties can add up fast.

  1. Fines and penalties. Councils can issue hefty fines for non-compliance, with some penalties exceeding $10,000 depending on the project and the breach.
  2. Demolition orders. If your build doesn’t meet regulations, you could be ordered to partially or fully demolish the work — an expensive and frustrating process.
  3. Insurance voids. Many insurance providers won’t cover work done without the proper permits. This means you’re on your own if something goes wrong during or after construction.
  4. Costly rectifications. Retrofitting work to meet building codes is often more expensive than doing it right the first time.

Long-term risks of non-compliance

The problems don’t stop after construction. Non-compliance can cause ongoing headaches for homeowners, especially when it’s time to sell or seek future approvals.

  1. Selling your property. If your home has unpermitted work, it can reduce its value or even scare off potential buyers. Most buyers will ask for proof of permits during the sale process, and missing paperwork can delay or derail a deal.
  2. Future council approvals. Non-compliance can put a red flag on your property, making future council approvals more difficult. You may be required to fix past building permit issues before new permits are granted.
  3. Legal disputes. Unpermitted work can lead to conflicts with neighbours, councils, or contractors, especially if it affects boundaries, zoning, or safety.

Skipping permits might feel like a shortcut, but it’s a gamble that rarely pays off. The reality is that cutting corners can lead to fines, delays, or worse — having to undo all your hard work. And let’s be honest, no one wants that kind of hassle hanging over their head.

When you follow the right process, you’re not just ticking boxes for councils; you’re protecting your investment and making sure your home is built to last. A properly permitted project doesn’t just give you peace of mind now — it saves you headaches down the track.

Supa Group will help you obtain a building permit, no problem

Navigating town planning approvals and building permits can feel overwhelming — there’s paperwork, council rules, and building codes to tackle before you even think about construction. That’s where we come in.

We’ve spent years helping homeowners get their projects off the ground, and we know the process inside and out. From preparing your documents to working with councils, our team takes care of the tricky bits so you can focus on what really matters — your new space.

Streamlining your application process

Getting started with a building permit in Melbourne means gathering the right paperwork, and let’s face it — that’s no small job. The good news? We’ve got it covered.

Our team makes sure all the details are spot-on from the beginning. We handle:

  • Architectural plans and engineering reports.
  • Energy efficiency ratings, like NatHERS certificates.
  • Title documents and zoning requirements.

We know exactly what surveyors and councils need, so there are no surprises or missing pieces. By getting it right upfront, we help avoid delays and keep your project moving forward.

Liaising with councils on your behalf

Every council has its own set of rules, and that can make the process feel like a minefield. Whether you’re dealing with the City of Melbourne building permit application process or a suburban council, we’re here to take the stress out of negotiations.

We communicate directly with councils on your behalf, whether it’s clarifying requirements, addressing overlays, or sorting out town planning approvals. If there are any hiccups, like requests for changes or extra reports, we’ll handle those too. You won’t have to deal with frustrating back-and-forth — we’ve got it sorted.

Ensuring compliance at every step

One of the biggest risks in any build is missing a compliance detail that causes trouble down the track. We don’t let that happen.

From start to finish, we make sure your project meets every regulation and building code. That includes:

  • Double-checking documentation for accuracy.
  • Coordinating mandatory inspections.
  • Ensuring plans align with safety and structural standards.

It’s all about doing things the right way, so you can move forward with confidence knowing your project is on solid ground.

Taking the stress out of permits

Navigating town planning and building permits doesn’t have to be a nightmare. When done right, these steps protect your project, keep everything above board, and make sure your build is safe and future-proof. The key is knowing what’s required and having the right people in your corner to guide you through the process.

That’s where we come in. We’ve decades of experience under our belts, and as our case studies show, we’ve seen it all — from first-home extensions to large-scale renovations. We know how to get permits approved without the stress, handling the paperwork, council requirements, and compliance checks so you don’t have to.

If you’re planning an extension or renovation and want it done right, let’s chat. We’ll take the hassle out of the process, so you can focus on the exciting part — creating a home you love.

Frequently asked questions about building permits in Victoria

If you’re new to building permits, you’re not alone. We get asked plenty of questions about the process, so here are clear, no-nonsense answers to some of the most common ones.

Do I need a building permit for a house extension?

Yes, you do. Any project involving structural changes, like a new room, second storey, or major renovations, will require a permit for a house extension. The permit ensures your plans meet Victorian building codes and safety standards. There are some exemptions for minor works, but it’s always best to check with a building surveyor or your council if you’re unsure.

How long does it take to get a building permit?

The timeline depends on the complexity of your project and how complete your application form is when it’s submitted. For straightforward extensions, you can expect approval within 2–4 weeks. More complex projects, like multi-storey builds or those requiring additional reports, may take longer — up to 6–8 weeks. Starting with all your documents in order can help speed up the process.

Can I apply for a building permit myself?

Technically, yes — but it’s not always straightforward. Applications need to be submitted to a registered building surveyor, and they’ll require detailed plans, engineering reports, and other documentation. If you’re confident managing the process, you can handle it yourself. However, most homeowners prefer to have experts manage the application to ensure everything is accurate and compliant from the start.

Related articles

No items found.